Baran residential tower 3

Koohsangi Street

Materials used:

Jet gypsum and isogyps: On the negative floors as well as swimming pools, saunas, dirty kitchens, toilets, parking lots and busy and humid areas.

K1 Flex adhesive: for bonding ceramics, slab stones and pool tiles.

Saralite: as a layer covering the walls and ceiling.

Decoplast: as the final layer of gypsum plaster as a coating layer of concrete and gypsum.

Date of implementation: Summer 2014 – Winter 2017

Execution area: 70,000 square meters

Customer Club Member: 1393-1401